Dust Suppression Systems

  • Medicines Gallery, Science Museum

    Brief Description: KpH Deconstruction successfully completed an 8 week Strip-Out and Enabling works project in the Medicines Galley (Level 1) at the Science Museum in London.

    Read more
  • 40-41 Great Marlborough Street, London – PHASE 2

    Brief Description: Following a successful enabling works phase, undertaken in the capacity of Principal Contractor, KpH undertook a 13 week demolition programme of a 3 storey extension at the back of 40-41 Great Marlborough Street in London on behalf of GPF Lewis.

    Read more
  • Cannon Bridge House – PHASE 1, 2 and 3

    Brief Description:  Working as the Principal Contractor (alongside Alinea Consulting and Turner & Townsend), KpH Deconstruction completed a three phase Strip Out and Enabling contract over a period of 34 weeks on Levels 1 and 2 at Cannon Bridge House for our client, Blackstone.

    Read more
  • Luton Airport

    Brief Description:  Working as Sub-Contractor for Area Square Ltd, KpH Deconstruction completed a contract, spanning over a 5 week period, to demolish the existing Easyjet/Easyland and Ocean Sky jet terminal buildings down to ground floor slab level.

    Read more