M&E Isolations
-
Medicines Gallery, Science Museum
Brief Description: Working alongside the Principle Contractor, Paragon, KpH undertook this Sympathetic Strip Out and Enabling Project within the stunning backdrop of The Science Museum. The works were carried out within the Medicine Gallery on Level 1 and included opening up works to facilitate the installation of the new Pendulum Lift.
-
66 Shoe Lane, London
Brief Description: In the capacity of Principal Contractor, KpH Deconstruction undertook this 15 week Strip Out and Enabling project at 66 Shoe Lane in London, working with Quantum Consulting on behalf of our client, Endurance Land. The site is a vacant 10-storey building, covering 15,000 m².
-
Building 1320, Arlington Business Park
Brief Description: KpH undertook this 5 week Strip Out and Enabling project for the Client, Patron, as the Principal Contractor, working alongside Beadmans.
-
Crossweys House, Guildford
Brief Description: KpH Deconstruction undertook this 6 week Strip Out and Enabling project, acting as a Principal Contractor, for our Client, DTZ Investors.