M&E Isolations
-
9 Devonshire Square, London
Brief Description: Over a total 14 week period, acting in the capacity of Principle Contractor, KpH Deconstruction carried out Strip Out and Enabling works at 9 Devonshire Square in London, working on behalf of our client Nuveen/WeWork. The building remained live throughout the duration of the refurbishment works, which took place on Levels 1, 2 and 5. Due to the building being occupied, noise monitoring was carried out and constant liaison with neighbours and security ensured smooth progression of works without incident.
-
Broadwalk House, 5 Appold Street, London
Brief Description: In the capacity of Principal Contractor, KpH completed this Sympathetic Strip Out, Enabling and Structural Alteration project at Somerset House, working alongside Sir Robert McAlpine.
-
UCL Rockefeller Building, London
Brief Description: KpH undertook this 18 week Strip Out and Enabling project at the Rockefeller Building on 21 University Street in London for client, ISG PLC.
-
1-5 London Wall Buildings, London
Brief Description: Acting in the capacity of Principal Contractor, KpH were engaged by Quantem Consulting, on behalf of our Client, Endurance Land, to undertake this 3 week Sympathetic Strip Out and Enabling project at 1-5 London Wall Buildings; a Grade II listed property (built in 1901) comprising of circa 209,307 ft² over 7 Floors, Ground, Lower Ground and Basement.