Work in Live/Occupied Buildings
-
The Courtauld Institute of Art, Somerset House, London
Brief Description: In the capacity of Principal Contractor, KpH completed this Sympathetic Strip Out, Enabling and Structural Alteration project at Somerset House, working alongside Sir Robert McAlpine.
-
UCL Rockefeller Building, London
Brief Description: KpH undertook this 18 week Strip Out and Enabling project at the Rockefeller Building on 21 University Street in London for client, ISG PLC.
-
1-5 London Wall Buildings, London
Brief Description: Acting in the capacity of Principal Contractor, KpH were engaged by Quantem Consulting, on behalf of our Client, Endurance Land, to undertake this 3 week Sympathetic Strip Out and Enabling project at 1-5 London Wall Buildings; a Grade II listed property (built in 1901) comprising of circa 209,307 ft² over 7 Floors, Ground, Lower Ground and Basement.
-
The Gherkin, London
Brief Description: KpH Deconstruction successfully completed this 1 week Strip Out and Enabling project for client, Square Metre.