Work in Live/Occupied Buildings

  • 1-5 London Wall Buildings, London

    Brief Description:  Acting in the capacity of Principal Contractor, KpH were engaged by Quantem Consulting, on behalf of our Client, Endurance Land, to undertake this 3 week Sympathetic Strip Out and Enabling project at 1-5 London Wall Buildings; a Grade II listed property (built in 1901) comprising of circa 209,307 ft² over 7 Floors, Ground, Lower Ground and Basement.

    Read more
  • The Gherkin, London

    Brief Description: KpH Deconstruction successfully completed this 1 week Strip Out and Enabling project for client, Square Metre.

    Read more
  • Building 3, Chiswick Park

    Brief Description: KpH undertook this 5 week Strip Out and Enabling project for the Client, Blackstone, as the Principal Contractor, working alongside Beadmans.

    Read more
  • Medicines Gallery, Science Museum

    Brief Description:  Working alongside the Principle Contractor, Paragon, KpH undertook this Sympathetic Strip Out and Enabling Project within the stunning backdrop of The Science Museum.  The works were carried out within the Medicine Gallery on Level 1 and included opening up works to facilitate the installation of the new Pendulum Lift.

    Read more