Sub-Contractor

  • The Gherkin, London

    Brief Description: KpH Deconstruction successfully completed this 1 week Strip Out and Enabling project for client, Square Metre.

    Read more
  • Medicines Gallery, Science Museum

    Brief Description:  Working alongside the Principle Contractor, Paragon, KpH undertook this Sympathetic Strip Out and Enabling Project within the stunning backdrop of The Science Museum.  The works were carried out within the Medicine Gallery on Level 1 and included opening up works to facilitate the installation of the new Pendulum Lift.

    Read more
  • Twickenham Stadium, London

    Brief Description: Working with Willmott Dixon Interiors, KpH completed the Strip Out and Concrete Demolition project of the Ground Floor, Level 3 and Level 4/5 Concourses at the prestigious Twickenham Stadium, South West London.

    Read more
  • Grove Lodge, London

    Brief Description:  KpH undertook this 5 week Strip Out and Enabling project for our Client, ME Construction, at Grove Lodge. The property is a residential dwelling made up of 3 Floors, a Basement, a separate Garage and 3 Outbuildings.

    Read more