Notifiable Non-Licenced Work (NNLW) Asbestos Removal

  • 7 Princes Street, London

    In the capacity of Principal Contractor, KpH Deconstruction undertook this 12 week Strip Out and Enabling project at 7 Princes Street, working with Abakus Consulting on behalf of our client, Morgan Capital.

    Works entailed a full strip-out of 7 storeys plus ground, lower ground and basement level commercial office building including lifts and all M&E with the exception of some CCTV and power to the gates for the rear courtyard, retaining stair cores and fire lobbies.

    Read more
  • The Hoo, Hampstead

    In the capacity of Principal Contractor, KpH Deconstruction undertook this 7 week Strip Out and Enabling project at The Hoo in Hampstead, working alongside Gardiner and Theobald.

    Grade II listed building, The Hoo, is a large detached house in the Hampstead area of the London Borough of Camden. An early design in the Queen Anne style by the architect Horace Field, it was built 1888–90 and altered 1987–88.

    Read more
  • One Golden Lane, London

    In the capacity of Principal Contractor, KpH Deconstruction undertook the soft strip and enabling works at One Golden Lane, working on behalf of CFP and in conjunction with Gardiner & Theobald.

    One Golden Lane is situated on an island site on the western side of Golden Lane, bounded by Brackley Street, Viscount Street, Cripplegate Street and Golden Lane directly to the north of the Barbican. The building is positioned in a thriving sub-market of London, a short walk from Barbican, Farringdon and Old Street Stations.

     

    Read more
  • 1-5 London Wall Buildings, London

    Brief Description:  Acting in the capacity of Principal Contractor, KpH were engaged by Quantem Consulting, on behalf of our Client, Endurance Land, to undertake this 3 week Sympathetic Strip Out and Enabling project at 1-5 London Wall Buildings; a Grade II listed property (built in 1901) comprising of circa 209,307 ft² over 7 Floors, Ground, Lower Ground and Basement.

    Read more