Notifiable Non-Licenced Work (NNLW) Asbestos Removal

  • Medicines Gallery, Science Museum

    Brief Description:  Working alongside the Principle Contractor, Paragon, KpH undertook this Sympathetic Strip Out and Enabling Project within the stunning backdrop of The Science Museum.  The works were carried out within the Medicine Gallery on Level 1 and included opening up works to facilitate the installation of the new Pendulum Lift.

    Read more
  • 1 Leadenhall Street, London

    Brief Description: In the capacity of Principal Contractor, KpH Deconstruction undertook this 12 week Strip Out project at 1 Leadenhall Court, Leadenhall Street in London. The project consisted of 11 floors, including a Lower and Upper Basement and a Roof averaging 1800m² per floor.

    Read more
  • 19 – 23 Wells Street, London

    Brief Description: KpH Deconstruction undertook this 6 week Strip Out and Enabling project as Principle Contractor at 19-23 Wells Street, London, for the client, British Land, alongside Cost Consultant, Alinea Consulting.

    Read more
  • Amersham Place, Amersham

    Brief Description: We successfully completed a 12 week programme of Strip-Out (back to core) and Enabling works at Amersham Place, an office block consisting of four floors (Lower Ground, Ground, Mezzanine, First and Second), including Roof Top Plant.

    Read more