M&E Isolations

  • 9 Devonshire Square, London

    Brief Description: Over a  total 14 week period, acting in the capacity of Principle Contractor, KpH Deconstruction carried out Strip Out and Enabling works at 9 Devonshire Square in London, working on behalf of our client Nuveen/WeWork. The building remained live throughout the duration of the refurbishment works, which took place on Levels 1, 2 and 5. Due to the building being occupied, noise monitoring was carried out and constant liaison with neighbours and security ensured smooth progression of works without incident.

    Read more
  • Broadwalk House, 5 Appold Street, London

    Brief Description:  In the capacity of Principal Contractor, KpH completed this Sympathetic Strip Out, Enabling and Structural Alteration project at Somerset House, working alongside Sir Robert McAlpine.

    Read more
  • UCL Rockefeller Building, London

    Brief Description:  KpH undertook this 18 week Strip Out and Enabling project at the Rockefeller Building on 21 University Street in London for client, ISG PLC.

    Read more
  • 1-5 London Wall Buildings, London

    Brief Description:  Acting in the capacity of Principal Contractor, KpH were engaged by Quantem Consulting, on behalf of our Client, Endurance Land, to undertake this 3 week Sympathetic Strip Out and Enabling project at 1-5 London Wall Buildings; a Grade II listed property (built in 1901) comprising of circa 209,307 ft² over 7 Floors, Ground, Lower Ground and Basement.

    Read more