M&E Isolations
-
Broadwalk House, 5 Appold Street, London
Brief Description: In the capacity of Principal Contractor, KpH completed this Sympathetic Strip Out, Enabling and Structural Alteration project at Somerset House, working alongside Sir Robert McAlpine.
-
UCL Rockefeller Building, London
Brief Description: KpH undertook this 18 week Strip Out and Enabling project at the Rockefeller Building on 21 University Street in London for client, ISG PLC.
-
1-5 London Wall Buildings, London
Brief Description: Acting in the capacity of Principal Contractor, KpH were engaged by Quantem Consulting, on behalf of our Client, Endurance Land, to undertake this 3 week Sympathetic Strip Out and Enabling project at 1-5 London Wall Buildings; a Grade II listed property (built in 1901) comprising of circa 209,307 ft² over 7 Floors, Ground, Lower Ground and Basement.
-
Medicines Gallery, Science Museum
Brief Description: Working alongside the Principle Contractor, Paragon, KpH undertook this Sympathetic Strip Out and Enabling Project within the stunning backdrop of The Science Museum. The works were carried out within the Medicine Gallery on Level 1 and included opening up works to facilitate the installation of the new Pendulum Lift.