M&E Isolations

  • 1 Knightsbridge, London

    Brief Description:KpH undertook this 9 month Strip Out & Enabling project as Principal Contractor at 1 Knightsbridge, London, working with cost consultants Alinea Consulting and Project Managers Gardiner & Theobold. Set on the south side of Knightsbridge close to the junction with Hyde Park Corner, the site is prominently located opposite Hyde Park and between two high profile thoroughfares, Knightsbridge and Grosvenor Crescent.

    Read more
  • 9 Devonshire Square, London

    Brief Description: Over a  total 14 week period, acting in the capacity of Principle Contractor, KpH Deconstruction carried out Strip Out and Enabling works at 9 Devonshire Square in London, working on behalf of our client Nuveen/WeWork. The building remained live throughout the duration of the refurbishment works, which took place on Levels 1, 2 and 5. Due to the building being occupied, noise monitoring was carried out and constant liaison with neighbours and security ensured smooth progression of works without incident.

    Read more
  • Broadwalk House, 5 Appold Street, London

    Brief Description:  In the capacity of Principal Contractor, KpH completed this Sympathetic Strip Out, Enabling and Structural Alteration project at Somerset House, working alongside Sir Robert McAlpine.

    Read more
  • UCL Rockefeller Building, London

    Brief Description:  KpH undertook this 18 week Strip Out and Enabling project at the Rockefeller Building on 21 University Street in London for client, ISG PLC.

    Read more