Dust Suppression Systems

  • Medicines Gallery, Science Museum

    Brief Description:  Working alongside the Principle Contractor, Paragon, KpH undertook this Sympathetic Strip Out and Enabling Project within the stunning backdrop of The Science Museum.  The works were carried out within the Medicine Gallery on Level 1 and included opening up works to facilitate the installation of the new Pendulum Lift.

    Read more
  • 25 North Colonnade, London

    Brief Description:  In the capacity of Principal Contractor, KpH Deconstruction undertook this 20 week Strip Out and Enabling project for Blackstone Property Management. The site is in a 16-storey office building, covering 32,000 m², built in the mid-1990s.

    Read more
  • Devon House, 1 St Katherine’s Way

    Brief Description: KpH Deconstruction was the Principle Contractor of an 18 week Strip Out and Enabling project at Devon House, which was successfully delivered to the client, Blackstone, through their Management Team, Beadmans.

    Read more
  • Citibank, 33 Canada Square, Canary Wharf

    Brief Description: KpH undertook this 7 week Strip Out and Enabling project at Citibank, Canary Wharf (a busy location surrounded by live buildings and high profile Organisations), for Principal Contractor, ISG.

    Read more