Dust Suppression Systems

  • One Golden Lane, London

    In the capacity of Principal Contractor, KpH Deconstruction undertook the soft strip and enabling works at One Golden Lane, working on behalf of CFP and in conjunction with Gardiner & Theobald.

    One Golden Lane is situated on an island site on the western side of Golden Lane, bounded by Brackley Street, Viscount Street, Cripplegate Street and Golden Lane directly to the north of the Barbican. The building is positioned in a thriving sub-market of London, a short walk from Barbican, Farringdon and Old Street Stations.

     

    Read more
  • Lakeside House, Uxbridge

    Brief Description: Working alongside our client Oakmont Construction, KpH Deconstruction completed a 16 week Strip Out and Enabling project at Lakeside House in Stockley Park. The works commenced just prior to the nationwide Covid-19 Lockdown in March 2020 which required our Site and Operations Management Team to react swiftly to the changes required to ensure our on-site operations could continue safely.

    Read more
  • The Courtauld Institute of Art, Somerset House, London

    Brief Description:  In the capacity of Principal Contractor, KpH completed this Sympathetic Strip Out, Enabling and Structural Alteration project at Somerset House, working alongside Sir Robert McAlpine.

    Read more
  • 1-5 London Wall Buildings, London

    Brief Description:  Acting in the capacity of Principal Contractor, KpH were engaged by Quantem Consulting, on behalf of our Client, Endurance Land, to undertake this 3 week Sympathetic Strip Out and Enabling project at 1-5 London Wall Buildings; a Grade II listed property (built in 1901) comprising of circa 209,307 ft² over 7 Floors, Ground, Lower Ground and Basement.

    Read more