Considerate Constructors Scheme Accredited

  • 3 Sheldon Square, London

    In the capacity of Principal Contractor, KpH Deconstruction undertook this 13 week Strip Out project at 3 Sheldon Square on behalf of British Land PLC and alongside Equals Consulting Ltd.

    The client commissioned full strip out works of 3 Sheldon Square prior to refurbishment which is a building comprising approximately 12,600 sqft of commercial office space spanning 9 upper floors, a lower ground floor, a changing room, rooftop, and parking facilities at basement level. In order to provide some betterment to the overall refurbishment programme KpH were engaged to undertake the strip out in advance on  lower ground, half of ground floor, 1st, 2nd 7th, ,8th and 9th floor.

    Read more
  • 25 North Colonnade, London

    Brief Description:  In the capacity of Principal Contractor, KpH Deconstruction undertook this 20 week Strip Out and Enabling project for Blackstone Property Management. The site is in a 16-storey office building, covering 32,000 m², built in the mid-1990s.

    Read more
  • 66 Shoe Lane, London

    Brief Description:  In the capacity of Principal Contractor, KpH Deconstruction undertook this 15 week Strip Out and Enabling project at 66 Shoe Lane in London, working with Quantum Consulting on behalf of our client, Endurance Land. The site is a vacant 10-storey building, covering 15,000 m².

    Read more
  • 1 Leadenhall Street, London

    Brief Description: In the capacity of Principal Contractor, KpH Deconstruction undertook this 12 week Strip Out project at 1 Leadenhall Court, Leadenhall Street in London. The project consisted of 11 floors, including a Lower and Upper Basement and a Roof averaging 1800m² per floor.

    Read more