Asbestos Survey
-
1-5 London Wall – Phase 2
Acting in the capacity of Principal Contractor, KpH were engaged by Quantem Consulting, on behalf of our Client, Endurance Land, to undertake Phase 2 of 2 which consisted of an 17 week Sympathetic Strip Out and Enabling project at 1-5 London Wall Buildings; a Grade II listed property (built in 1901). The building is comprised of circa 209,307 ft² of office, A1, A3 and ancillary accommodation arranged over basement, lower ground, ground and eight upper floors.
-
Broadgate Quarter, 1 Snowden Street
Brief Description: Acting in the capacity of Principal Contractor, KpH were engaged by Beadmans on behalf of our Client, Blackstone Property Management, to undertake the full Strip Out back to core of Retail, Commercial and Storage Units on the Ground Floor within the Broadgate Quarter Building.
-
1 Leadenhall Street, London
Brief Description: In the capacity of Principal Contractor, KpH Deconstruction undertook this 12 week Strip Out project at 1 Leadenhall Court, Leadenhall Street in London. The project consisted of 11 floors, including a Lower and Upper Basement and a Roof averaging 1800m² per floor.
-
Medicines Gallery, Science Museum
Brief Description: KpH Deconstruction successfully completed an 8 week Strip-Out and Enabling works project in the Medicines Galley (Level 1) at the Science Museum in London.